Physical Tool‑Use Capabilities of Gemini 3.7 Flash
August 17, 2026
Gemini 3.6 Flash and Gemini 3.7 Flash were each given control of YAM arms to complete the following prompt: “Lift the towels with both your arms high enough to then drop it to cover the block.”
Gemini 3.7 Flash scores 92% on this task, up from 32% for Gemini 3.6 Flash, released just a month earlier.
Physical Tool‑Use — Covering a Block with a Towel
Mean rubric score across five runs per model (max 100).
Milestones
Each run is graded by hand on a cumulative milestone ladder.
1. picks towel 10 pts
2. uses both arms 10 pts
3. lifts towel up 20 pts
4. partial / full cover 20 pts / 40 pts
A sixth milestone, judges correctly (20 pts), credits a final done / give‑up verdict that matches what actually happened on the table.
Per-Turn Latency
Lower is better (faster inference).
Mean inference latency per turn. Robot motion excluded.
All Runs
| Model | Score | Time (min) | Transcript | Rerun (.rrd) |
|---|---|---|---|---|
| Gemini 3.7 Flash | 100 | 2.3 | view | download |
| Gemini 3.7 Flash | 100 | 2.8 | view | download |
| Gemini 3.7 Flash | 100 | 2.8 | view | download |
| Gemini 3.7 Flash | 100 | 3.3 | view | download |
| Gemini 3.7 Flash | 60 | 4.1 | view | download |
| Gemini 3.6 Flash | 50 | 18.2 | view | download |
| Gemini 3.6 Flash | 40 | 32.0 | view | download |
| Gemini 3.6 Flash | 40 | 34.6 | view | download |
| Gemini 3.6 Flash | 30 | 22.6 | view | download |
| Gemini 3.6 Flash | 0 | 37.2 | view | download |
Technical Specifications
| Arms | I2RT YAM bimanual arms (two 6‑DoF arms with parallel grippers) |
| Cameras | fixed overhead Intel RealSense D435 + one Intel RealSense D405 on each wrist, 224×224 RGB |
| Models | Gemini 3.6 Flash and Gemini 3.7 Flash on the Interactions API, effort high, 5 runs each |
| Instruction | “Lift the towels with both your arms high enough to then drop it to cover the block.” |
| Max turns | 100 LLM calls per run |
| Actions | one move per LLM call (action horizon 1); arm speed capped at 10% for safety |
| Harness | inspect‑robots 0.53.1; collision guardrail off, joint‑effort reporting on, rig facts / formulas / advice documents in the system prompt; full wire capture |
| Scoring | manual milestone grading from the run videos |